Testing

Comprehensive testing is key to the successful completion of any network project. Globe develops detailed test plans and conducts the testing to verify the operation of every component. In some cases, test software applications are developed to fully exercise all system functions.

The first testing stage verifies operation of the components and configuration prior to the initial installation. In larger projects each component is tested after installation to ensure that it works independently. Finally, acceptance testing is conducted to demonstrate that the completed installation meets all requirements.

If the building blocks in the system are fully tested, the network can be integrated with fewer roadblocks. This process of intermeditate testing provides troubleshooting benchmarks for integration.

Complete test results can be an important tool in maintenance and troubleshooting as they document the original operational parameters. This allows the source of a problem to be located more easily.


Video Testing with VM700

© Globe Network Integrators Inc. 2017
Integration Specialists
info@globenet.ca